Shovel Build Projects, NSW
Project Scope
- Supply of 65 tradesmen over 2 projects (Mt Thorley & Mt Arthur)
- The build of 4100xpc mining shovel
Role of the Busicom Trade Team
RIGGERS |
CRANE OPERATORS |
ELECTRICIANS |
- Installed cables, pulleys, chain blocks
- Make slinging equipment & attach it to the load
- Component parts in place & rigging cables
- Erect structural steel & other objects for shovel
- Inspect, maintain & repair equipment
- Make sure that safety requirements are met at all times
|
- Monitor material in each load.
- Ensure cranes are ready for use by checking controls, instruments & gauges
- Observe & follow the signals given by dogmen
- Maintain cranes by inspecting them for defects, lubricate ropes & winches, & replace cables.
|
- Maintain lighting, switches & electrical equipment
- Install wiring & electrical circuits for additions to site
- Carry out electrical fitting, high voltage switching
- Be able to read wiring diagrams to plan layout
- Install insulated cables & connect switches, outlets & other fittings
- Test electrical circuits & equipment
|
OH&S OFFICER |
MECHANICAL FITTERS |
BOILERMAKERS / WELDERS |
- Reviewed HSE management systems & assisted in the change process
- Monitored & reported HSE performance, investigated safety related incidents & provided recommendations
- Conducted audits/drug & alcohol screening
|
- Assembled machinery parts & equipment on shovel
- Align & fit motors & parts
- Installing of valves & gauges
- Problem solving & fault finding
- Identify & repair parts & accessories
|
- Mark, measure & weld structures & parts together
- Checked for weak spots, cracks & defective sections for repair
- Install manholes, floor plates, framework, valves & gauges,
- Modifications of external/internal parts on the shovel
- Overhead welding, grinding, preheating & oxy-cutting
|